The Paving is done and looks great.
The new bathroom has arrived. The final trenching for swipes and power has been completed. The utilities are still needed. If all goes right, the bathrooms should be up and running for Christmas.
Mats with the AFGC logo have been put in Range 5 to show shooting positions. Please do not move them around. They look great, Geoff.
We made and installed some signs about casing and uncasing guns at the drop tables. DO NOT DO IT. Casing and uncasing should be done at the firing line
ADT was in and replace some line and sensors.
Range 2 has been closed the last two Fridays of November. We thank everyone for their understanding. The blackberry cleanup is done and the trenching of the gas line is finished. The heating company will still need a couple days for heater installation but that will be a little later in December.
The annual fire extinguisher inspection has been completed.
Snow stops have been installed on Range 1 roof.
We painted and installed new board for the metal that protects the Range 1 back doors. Dan made a cover box to protect the plumbing in the trap house. We replace the old tables in the trap house and moved some of the chairs into storage. Also it has a new gas heater.
As well as our normal routine. We wish you all a very Merry Christmas!
Dan Ashton and Audrey Oxner